Springs Roofing Services
Everything we do is roofing. That focus means our Springs crews install more roofs per year than companies that try to do siding, windows, and remodeling on the side.
Roof Replacement
Your roof replacement includes a full-system install: ice and water shield at eaves, valleys, and penetrations; synthetic underlayment across the entire deck; aluminum drip edge at rake and eave; starter strip with sealant; architectural shingles with 130+ mph wind rating; and continuous ridge vent for proper attic ventilation. We also install new pipe boots and vent flashing on every penetration.
Get a Free Quote โRoof Repair
Emergency roof repairs in Springs within 24 hours for active leaks. We tarp the area to stop immediate water entry, then schedule the permanent fix. Weekend and holiday emergency service available. Call (877) 586-1316.
Get a Free Quote โStorm Damage Repair
Storm damage is time-sensitive. Most insurance policies in Pennsylvania require claims within 12 months. We do a free inspection, document every damaged area with photos and measurements, and help you file the claim. If the adjuster approves it, we handle the repairs at the insurance-approved price.
Get a Free Quote โNew Roof Installation
We handle new construction from permits through final inspection. Our Springs office coordinates with your builder on scheduling, material delivery, and inspection timing. Typical install time is 1-3 days depending on size and complexity.
Get a Free Quote โMetal Roofing
Corrugated metal and R-panel (exposed fastener) at $5-$8/sq ft installed for agricultural buildings, shops, carports, and covered patios in Springs. 29-gauge is budget, 26-gauge is standard. For residential, we recommend 24-gauge standing seam at $12-$22/sq ft. The aesthetics and longevity justify the premium. DaVinci composite shake and slate profiles offer the look of natural materials with metal's performance. Perfect for Springs HOA neighborhoods that restrict metal roofing appearance.
Get a Free Quote โShingle Roofing
Designer shingles like GAF Camelot II, Owens Corning Berkshire, and CertainTeed Grand Manor mimic premium materials. Slate, cedar shake, heavy wood. They cost 30-50% more than standard architectural shingles but the curb appeal is worth it for higher-end Springs homes. Full manufacturer warranties included.
Get a Free Quote โFlat Roofing
Flat roofs don't actually drain themselves. That's the challenge. Water ponds, UV breaks down the membrane, and eventually it leaks. We install and repair TPO, PVC, EPDM, modified bitumen, and built-up roofing systems designed for zero-slope conditions in Springs.
Get a Free Quote โCommercial Roofing
Commercial roofing in Springs means flat and low-slope systems: TPO, EPDM, PVC, modified bitumen, and built-up roofing. We install and repair all of them. Retail, warehouse, office, restaurant, multi-family. Our commercial crew handles buildings from 2,000 to 100,000 square feet.
Get a Free Quote โGutter Installation
Gutter replacement in Springs costs $8-$15 per linear foot installed. That includes hangers, end caps, outlet drops, miters, and at least two downspout runs. Copper is $25-$40 per foot. We give exact pricing in the estimate. No ranges.
Get a Free Quote โRoof Inspection
Our 27-point residential roof inspection: (1) shingle condition and granule loss, (2) nail pops, (3) lifting tabs, (4) ridge cap integrity, (5) valley flashing, (6) step flashing at walls, (7) chimney flashing and counter-flashing, (8) drip edge condition, (9) pipe boot seals, (10) plumbing and HVAC vent integrity, (11) ridge vent function, (12) soffit ventilation, (13) gutter pitch and capacity, (14) downspout drainage, (15) fascia condition, (16) soffit condition, (17) ice dam evidence, (18) moss or algae growth, (19-27) attic: decking moisture, insulation displacement, rafter condition, bathroom exhaust routing, daylight penetration, ventilation balance, mold indicators, pest intrusion, previous repair evidence. Written report with annotated photos emailed same day.
Get a Free Quote โEmergency Roof Repair
Emergency protocol for active water intrusion: (1) interior containment. Buckets, plastic sheeting, water extraction if accessible, (2) exterior tarping with 20x30 heavy-duty poly sheeting over damaged area extending minimum 4 feet past damage on all sides, (3) secure with 2x4 nailer boards lag-screwed to the roof deck (not through shingles), (4) secondary tarp overlap for multi-section damage, (5) document with timestamped photos for insurance. Permanent repair scheduled within 48-72 hours once materials are sourced.
Get a Free Quote โSkylight Installation
VELUX FS (fixed) and VS (vented) skylights installed with EDL flashing kits for shingle roofs. The multi-step flashing integrates with the surrounding shingle courses per IRC R903.2. We frame the curb with doubled 2x8 or 2x10 lumber (depending on rafter depth), install ice and water shield membrane around the entire curb perimeter, then set the skylight with factory sealant before weaving step flashing into the field. Top headwall flashing tucks under the upslope shingle course. Bottom sill pan diverts water onto the downslope shingles. Zero exposed sealant joints. Mechanical flashing only.
Get a Free Quote โ